PA-SEALCOAT RAPID UV

Go back to product info

Preparation

  • drill with mixing spindle attachment
  • gloves
  • white floor squeegee
  • nylon roll
  • adhesive tape

Mixing

  • Check there is enough product available
  • Wear clean clothes and overshoes
  • Tape off edges
  • Remove any fluff or other foreign objects from nylon roll using tape
  • Make the floor dust-free

Mixing

  • Combine the A and B component in the correct proportion (see label)
  • add max 0% to 4% anhydrous acetone (note: acetone is flammable…)
  • 2 min. mix, low speed

Cleaning

  • Pour max.700 g/m² of product onto the floor
  • Spread immediately with a 50 cm roll
  • Roll and lift backwards and forwards
  • Remove tape sequentially

Additional points of attention

  • Clean with acetone

Disclaimer

  • Do not roll too fast to avoid splashes
  • This product cures faster with moisture from the air (on the floor). So don’t pour everything directly on the floor as you would with other epoxy products
  • The rapid curing makes the flow limited, which means rolling must be carried out as quickly and as well as possible
  • It is possible that a second layer must be laid within 4 hours

Video

Disclaimer

These brief installation instructions are provided to help you quickly get started with the installation. However, it is important to first read the technical data sheet and to take note of the safety data sheets Both documents can be found at the bottom of this page under downloads.

Downloads

Public downloads

  🇳🇱 🇫🇷 🇬🇧 🇩🇪
TDS

NL

DE

MSDS A

NL

FR

EN

DE

MSDS B

NL

FR

EN

DE

Contact our Sales Team and order now.

Contact our Sales Team and order now.